Access to Talbot Campus from Monday 15 September
Posted on Friday, September 12 2014
Over the summer, work on BU’s flagship New Academic Building started on Talbot Campus. The building, due to open in summer 2016, will host academic and support facilities, including seminar rooms, lecture theatres, break out space and catering facilities.
Due to the construction work taking place on site, temporary pedestrian routes are necessary and signs will be provided to guide on key preferred/shortest routes.
Pedestrians should remain on the pathways and follow safety instructions. The pedestrian path along the campus road will be re-routed through the student village – please do not walk on the campus road.
Cyclists should remain on the campus road (not pathways).
Students should also be aware that following recent feedback about the university bus services, some changes have been made to help make your journeys between campuses and around the Bournemouth area easier and more efficient. These changes will come into effect on Monday 15 September and more information about the different services can be found on the Bus for BU website.